| Demolition Foundations and New Swimming Pool |
|
A client near Dorking required the demolition of an existing bungalow which Earthwurks crushed and reused on site saving muck away and the cost of buying crushed concrete product in. 150 linear meters of foundations were excavated and poured with a block and beam floor installed to give an area of approximately 300 m2. A new modular indoor swimming pool was assembled and concreted into position. As a factory cut timber frame was to be assembled on top of our work dimensional accuracy was important. We achieved this to 0.004% of plan dimension which delighted the timber frame company. Image galllery: click on any image to enlarge.Groundwork Case Studies:
|